Community Diagnostic Centre

EXPLORE MORE HEALTHCARE PROJECTS
 

About

  • Location: Scunthorpe

    Client: Northern Lincolnshire and Goole NHS Foundation Trust

    Value: £19 million

  • The brief was ambitious: construct a high-performing, BREEAM Excellent-rated facility in a landlocked city-centre location, with a tight programme, complex clinical integration, and zero disruption to surrounding infrastructure. All while providing real, measurable value to both the NHS and local community.

  • In response to the NHS’s national rollout of Community Diagnostic Centres (CDCs), Helix CMS was appointed to deliver a landmark two-storey, 2,000sqm facility. One of the first purpose-built CDCs in the country and a cornerstone of the government’s strategy to improve early diagnosis, reduce hospital pressure, and enhance accessibility to vital diagnostic services.

  • The highly technical healthcare project in a landlocked, city-centre location involved:

    • Full steel frame construction on CFA piles with ground beams and slabs

    • Complete external works including glazing, façade cladding, curtain walling, and drainage

    • Full internal fast-track fit out over two floors, including MRI/CT/X-ray rooms, ultrasound suites, blood test areas, and reception spaces

    • Creation of specialist medical environments including lead-lined walls, RF cages, negative air pressure cubicles, and Draeger ceiling pendants

    • Installation of a bespoke plantroom, state-of-the-art mechanical and electrical systems, and advanced infection control measures

    • Designed and delivered to achieve BREEAM Excellent using sustainable materials and energy-efficient systems including PV panels and high thermal mass concrete slabs

    • Detailed logistics and traffic management planning in collaboration with the Highways Authority and adjacent stakeholders

    • Construction close to a live culvert, with proactive structural and geotechnical risk management

    • Simultaneous delivery of shell, core, and fit out, requiring agile sequencing and real-time coordination across all trades

    • Mitigation of structural vibration risks during steel erection and equipment installation, especially critical for MRI and CT environments

    • Full lift design and installation, including shaft construction in a confined footprint

    • Daily site coordination meetings with the client and adjacent businesses

    • Fall protection, edge protection, and safety netting during structural steel works

    • Site segregation, signage, and pedestrian management to protect the public

    • Robust ISO-accredited quality and environmental management systems, audited throughout the build by our compliance team

Watch the case study

  • Enabling 146,000 additional diagnostic appointments per year, improving early diagnosis, relieving pressure on local hospitals, and providing faster, more convenient care for residents across Scunthorpe and beyond

  • Designed and delivered to achieve BREEAM Excellent using sustainable materials and energy-efficient systems including PV panels and high thermal mass concrete slabs

  • Complete external works including full steel frame construction on CFA piles with ground beams and slabs, glazing, façade cladding, curtain walling, and drainage

  • Full internal fast-track fit out over two floors, installing specialist medical equipment and environments including lead-lined walls, RF cages and negative air pressure cubicles

“This will have such a positive impact on healthcare in our region. Town centre access, coordinated appointments, and a more patient-friendly experience. It's a brilliant step forward for the community.”

Alex Seale, Place Director, NHS Humber & North Yorkshire Integrated Care Board