University of Hull Accommodation
About
Location: The University of Hull
Client: The University of Hull
Value: £482k
Timeframe: 6 weeks
-
6-week fast-track, full re-fit and refurbishment of campus accommodation including 84 bedrooms and 4 studios, across 2 building blocks, delivered during the summer break, ready for students to return to in the new semester.
-
As experts in fast-track construction, we proposed a specific programme and sequencing of works to complete floor by floor, top-down in the buildings. Enabling concurrent working between blocks A&B. Completion of daily digital quality assurance inspections ensure compliance and specification checklists could be reviewed for all project elements preloaded into Procore.
-
Stringent hygiene standards to ensure facilities meet health and safety regulation
M&E isolations, disconnections and enabling works
Soft strip out, removing old furniture and disposal
Joinery works including new kitchen, alterations to fire doors and skirting boards
Flooring installation and all painting and decorating finishes
Plumping works including new showers, taps and kitchen sinks
Installation of fire stopping solutions
Provision of H&S File and O&M’s
Completed handover with training and demonstration as required by the Client team
Explore more education projects